| B199543 | 06/21/2007 | ||||
| Exhibits A-J to Petition for Writ of Review | |||||
| |||||
| B199543 | 06/20/2007 | ||||
| Petion for Wirt of Review and Memorandume of Points and Authorities | |||||
| |||||
| ||||||
| B206516 | 04/10/2008 | ||||
| SCE Opposition to Respondents Motion | |||||
| |||||
|
| ||||||
| A.02-05-004 Phase 1 | 01/21/2009 | ||||
| SCE's Letter Requesting Extension of Time to Comply with Ordering Paragraph 13 of D.04-07-022. | |||||
| |||||
| ||||||
| A.04-12-014 | 02/02/2005 | ||||
| Reply of SCE to Response and Protests | |||||
| |||||
| ||||||
| A.07-05-003, 007 & 008 | 05/27/2008 | ||||
| Ex Parte SCE met with Steve St. Marie, Advisor to Commissioner Bohn on May22, 2008 | |||||
| |||||
| A.07-05-003, 007 & 008 | 05/19/2008 | ||||
| Ex Parte SCE met with Steve St. Marie, advisor to Commissioner John Bohn on May 16, 2008 | |||||
| |||||
| A.07-05-003, 007 & 008 | 01/14/2008 | ||||
| SCE's Application for Authorized Cost of Capital for Utility Operations for 2008 | |||||
| |||||
| A.07-05-003, 007 & 008 | 01/14/2008 | ||||
| SCE's Notice of Availiability - 2008 COC | |||||
| |||||
| A.07-05-003, 007 & 008 | 02/13/2008 | ||||
| SCE's Opening Brief | |||||
| |||||
| A.07-05-003, 007 & 008 | 01/18/2008 | ||||
| SCE's Rebuttal Testimony in Support of 2008 COC Application | |||||
| |||||
| A.07-05-003, 007 & 008 | 01/14/2008 | ||||
| SCE's Testimony in Support of Its 2008 Cost of Capital Application | |||||
| |||||
| A.07-05-003, 007 & 008 | 02/21/2008 | ||||
| SCE Reply Brief | |||||
| |||||
| A.07-05-003, 007 & 008 | 03/20/2008 | ||||
| SCE Response to Request of AGLET & TURN for Award of Compensation | |||||
| |||||
| A.07-05-003, 007 & 008 | 08/07/2009 | ||||
| SCE & DRA's Joint Petition to Modify Decision 08-05-035 | |||||
| |||||
| A.07-05-003, 007 & 008 | 05/28/2008 | ||||
| SCEs COC Ph 2 Reply Comments | |||||
| |||||
| A.07-05-003, 007 & 008 | 05/19/2008 | ||||
| SCEs Opening Cmts on Ph 2 PD | |||||
| |||||
| ||||||
| A.07-05-003 | 05/22/2007 | ||||
| Ex Parte SCE met with Andrew Campbell, Advisor to Commisoner Chong on May 16, 2007 | |||||
| |||||
| A.07-05-003 | 10/18/2007 | ||||
| Ex Parte SCE met with Commissioner Bohn on October 15, 2007 | |||||
| |||||
| A.07-05-003 | 10/18/2007 | ||||
| Ex Parte SCE met with Commissioner Bohn on October 15, 2007 | |||||
| |||||
| A.07-05-003 | 11/29/2007 | ||||
| Ex Parte SCE met with Commissioner Simon and Advisors Jaclyn Marks and Bob Mason on November 26, 2007 | |||||
| |||||
| A.07-05-003 | 06/18/2007 | ||||
| Reply of SCE to Protest of DRA | |||||
| |||||
| A.07-05-003 | 05/16/2007 | ||||
| SCE's Amended Application for Authorized Cost of Capital for Utility Operations for 2008 | |||||
| |||||
| A.07-05-003 | 05/16/2007 | ||||
| SCE's Amended Application for Authorized Cost of Capital for Utility Operations for 2008 | |||||
| |||||
| A.07-05-003 | 08/03/2007 | ||||
| SCE's Errata to Exhibit SCE-1, Table III-4 | |||||
| |||||
| A.07-05-003 | 09/20/2007 | ||||
| SCE's Late-Filed Exhibit 64 | |||||
| |||||
| A.07-05-003 | 05/16/2007 | ||||
| SCE's Notice of Amended Application in Compliance with Rule 3.2(B) | |||||
| |||||
| A.07-05-003 | 09/27/2007 | ||||
| SCE's Opening Brief | |||||
| |||||
| A.07-05-003 | 11/26/2007 | ||||
| SCE's Opening Comments on PD | |||||
| |||||
| A.07-05-003 | 06/20/2007 | ||||
| SCE's Proof of Compliance with Notice Requirements for Cost of Capital Application No. 07-05-003 | |||||
| |||||
| A.07-05-003 | 09/06/2007 | ||||
| SCE's Proof of Compliance with Rule 13.1B | |||||
| |||||
| A.07-05-003 | 09/26/2007 | ||||
| SCE's Proposed Transcript Corrections | |||||
| |||||
| A.07-05-003 | 10/05/2007 | ||||
| SCE's Reply Brief | |||||
| |||||
| A.07-05-003 | 01/04/2008 | ||||
| SCE's Supplemental Testimony Regarding Multi-Year Cost of Capital Mechanisms | |||||
| |||||
| A.07-05-003 | 05/11/2007 | ||||
| SCE Notice of Application in Compliance with Rule 3.2 B. | |||||
| |||||
| A.07-05-003 | 05/11/2007 | ||||
| SCE Notice of Compliance with Rule 3.2B. | |||||
| |||||
| A.07-05-003 | 08/28/2007 | ||||
| SCE Rebuttal Testimony | |||||
| |||||
| A.07-05-003 | 12/03/2007 | ||||
| SCE Reply Comments | |||||
| |||||
| ||||||
| A.08-03-002 | 09/18/2008 | ||||
| Ex Parte SCE met with Matthew Deal, Advisor to President Peevey on September 12, 2008 | |||||
| |||||
| A.08-03-002 | 09/24/2008 | ||||
| Ex Parte SCE met with Stephen St. Marie and Robert Kinosian, Advisors to Commissioner Bohn on September 16, 2008 | |||||
| |||||
| A.08-03-002 | 08/14/2009 | ||||
| Ex Parte SCE Representatives met with Advisor Andrew Campbell on August 11, 2009 | |||||
| |||||
| A.08-03-002 | 08/07/2009 | ||||
| Ex Parte SCE representatives met with Advisor Matthew Deal on August 5, 2009 | |||||
| |||||
| A.08-03-002 | 02/05/2009 | ||||
| Motion of SCE and Settling Parties for Adoption of Medium and Large Power Rate Design Settlement Agreement | |||||
| |||||
| A.08-03-002 | 02/05/2009 | ||||
| Motion of SCE and Settling Parties for Adoption of Phase 2 Agriculture and Pumping Rate Group Design Settlement Agreement | |||||
| |||||
| A.08-03-002 | 01/26/2009 | ||||
| Motion of SCE and Settling Parties for Adoption of Residential and Small Commercial Rate Design Settlement Agreement | |||||
| |||||
| A.08-03-002 | 02/11/2009 | ||||
| SCE Amendment to the Motion of SCE and Settling Parties for Adoption of Medium and Large Power Rate Design Settlement Agreement | |||||
| |||||
| A.08-03-002 | 06/19/2009 | ||||
| SCE Comments on ACR Regarding Revised Schedule for 2009 Rate Design Window Application | |||||
| |||||
| A.08-03-002 | 06/16/2009 | ||||
| SCE Comments on ACR Regarding Revised Schedule for 2009 Rate Design Window Application. | |||||
| |||||
| A.08-03-002 | 03/23/2009 | ||||
| SCE Comments on Schedule to Design and Adopt Dynamic Pricing Rates | |||||
| |||||
| A.08-03-002 | 04/04/2008 | ||||
| SCE Compliance Filing Pursuant to Ruling Consolidating Applications | |||||
| |||||
| A.08-03-002 | 01/20/2009 | ||||
| SCE Motion and Settling Parties for Adoption of Commercial Submetering Settlement Agreement | |||||
| |||||
| A.08-03-002 | 01/09/2009 | ||||
| SCE Motion and Settling Parties for Adoption of Revenue Allocation Settlement Agreement | |||||
| |||||
| A.08-03-002 | 01/20/2009 | ||||
| SCE Motion and Settling Parties for Adoption of Street Light Rate Group Settlement Agreement | |||||
| |||||
| A.08-03-002 | 01/16/2009 | ||||
| SCE Motion to Strike Testimony of Transphase | |||||
| |||||
| A.08-03-002 | 07/06/2009 | ||||
| SCE Motion to Update Settlement Agreements to Reflect Updated Revenue Requirements and Proposed Rates | |||||
| |||||
| A.08-03-002 | 02/20/2009 | ||||
| SCE Opening Brief | |||||
| |||||
| A.08-03-002 | 07/20/2009 | ||||
| SCE Opening Comments on PD of ALJ Yip-Kikugawa | |||||
| |||||
| A.08-03-002 | 10/23/2008 | ||||
| SCE Proof of Rule 13.1 Notice Requirement | |||||
| |||||
| A.08-03-002 | 01/08/2009 | ||||
| SCE Proof of Rule 13.1 Notice Requirements | |||||
| |||||
| A.08-03-002 | 06/27/2008 | ||||
| SCE Proof of Rule 13.1 Notice Requirements | |||||
| |||||
| A.08-03-002 | 03/24/2008 | ||||
| SCE Proof of Rule 3.2c Notice Requirement | |||||
| |||||
| A.08-03-002 | 04/21/2008 | ||||
| SCE Proof of Rule 3.2D Notice Requirement | |||||
| |||||
| A.08-03-002 | 03/06/2009 | ||||
| SCE Reply Brief | |||||
| |||||
| A.08-03-002 | 02/06/2009 | ||||
| SCE Reply Comments to SJVPA on the Residential and Small Commercial Rate Design Settlement Agreement | |||||
| |||||
| A.08-03-002 | 01/30/2009 | ||||
| SCE Reply to Comments of Transphase on the Phase II Revenue Allocation Settlement Agreement | |||||
| |||||
| A.08-03-002 | 07/24/2009 | ||||
| SCE Reply to Comments on PD of ALJ Yip-Kikugawa | |||||
| |||||
| A.08-03-002 | 04/21/2008 | ||||
| SCE Reply to Protest of BOMA | |||||
| |||||
| A.08-03-002 | 04/21/2008 | ||||
| SCE Reply to Protests | |||||
| |||||
| A.08-03-002 | 09/30/2009 | ||||
| SCE Response to Application for Rehearing in Decision 09-08-028 | |||||
| |||||
| A.08-03-002 | 08/10/2009 | ||||
| SCE Response to Ruling Requesting Comments | |||||
| |||||
| A.08-03-002 | 08/07/2009 | ||||
| SCE Response to Ruling Requesting Comments | |||||
| |||||
| A.08-03-002 | 06/27/2008 | ||||
| SCE Updated Testimony-01 Policy Proposals | |||||
| |||||
| A.08-03-002 | 06/27/2008 | ||||
| SCE Updated Testimony-02 Marginal Cost and Sales Forcast Proposals | |||||
| |||||
| A.08-03-002 | 06/27/2008 | ||||
| SCE Updated Testimony-03 Revenue Allocation Proposals | |||||
| |||||
| A.08-03-002 | 06/27/2008 | ||||
| SCE Updated Testimony-03 Revenue Allocation Proposals | |||||
| |||||
| A.08-03-002 | 06/27/2008 | ||||
| SCE Updated Testimony-04 Rate Design Proposal | |||||
| |||||
| A.08-03-002 | 06/27/2008 | ||||
| SCE Updated Testimony-05 Tariff Changes | |||||
| |||||
| A.08-03-002 | 06/27/2008 | ||||
| SCE Updated Testimony-06 Witness Qualifications | |||||
| |||||
| A.08-03-002 | 07/15/2008 | ||||
| SCE UPDATED Workpapers SCE02 Vol 1 | |||||
| |||||
| A.08-03-002 | 07/15/2008 | ||||
| SCE UPDATED Workpapers SCE03_04 | |||||
| |||||
| A.08-03-002 | 03/18/2008 | ||||
| SCE Workpapers S.02 Vol.01 | |||||
| |||||
| A.08-03-002 | 03/18/2008 | ||||
| SCE Workpapers S.02 Vol.02 | |||||
| |||||
| A.08-03-002 | 03/18/2008 | ||||
| SCE Workpapers S.03_04 | |||||
| |||||
| ||||||
| A.09-12-024 | 05/07/2010 | ||||
| SCE In the Matter of the Application for Authority to Make Various Electric Rate Design Changes | |||||
| |||||
| A.09-12-024 | 06/10/2010 | ||||
| SCE Opening Comments on Proposed Decision Granting Authority to CA-2009 GRC Phase II Group List | |||||
| |||||
| A.09-12-024 | 02/18/2010 | ||||
| SCE Prehearing Conference Statement | |||||
| |||||
| A.09-12-024 | 03/26/2010 | ||||
| SCE Reply Brief | |||||
| |||||
| A.09-12-024 | 02/10/2010 | ||||
| SCE Reply to Protests | |||||
| |||||
| ||||||
| A.10-08-XXX (ERRA) | 08/03/2010 | ||||
| SCE-1 PUBLIC Testimony of ERRA Forecast 2011 | |||||
| |||||
| A.10-08-XXX (ERRA) | 08/03/2010 | ||||
| SCE Application of ERRA Forecast 2011 | |||||
| |||||
| A.10-08-XXX (ERRA) | 08/03/2010 | ||||
| SCE Witness Quals of ERRA Forecast 2011 | |||||
| |||||
| ||||||
| A.10-08-001 | 08/02/2010 | ||||
| SCE-1 PUBLIC Testimony of ERRA Forecast 2011 | |||||
| |||||
| A.10-08-001 | 08/02/2010 | ||||
| SCE Application of ERRA Forecast 2011 | |||||
| |||||
| A.10-08-001 | 08/04/2010 | ||||
| SCE NOA for 2011 ERRA Forecast | |||||
| |||||
| A.10-08-001 | 08/23/2010 | ||||
| SCE Proof of Complaince with Rules 3.2b and 3.2c | |||||
| |||||
| A.10-08-001 | 08/02/2010 | ||||
| SCE Witness Quals of ERRA Forecast 2011 | |||||
| |||||
| ||||||
| A.08-06-001 et al. | 02/18/2009 | ||||
| Declaration of Larry Oliva re Confidentiality of Certain Data | |||||
| |||||
| A.08-06-001 et al. | 02/18/2009 | ||||
| Declaration of Larry Oliva re Confidentiality of Certain Data | |||||
| |||||
| A.08-06-001 et al. | 08/14/2009 | ||||
| Ex Parte SCE Represenatives met with Advisor Andrew Campbell on August 11, 2009 | |||||
| |||||
| A.08-06-001 et al. | 08/24/2009 | ||||
| Ex Parte SCE Representative Michael Hoover met with Advisor Andrew Campbell via conference call on August 19, 2009 | |||||
| |||||
| A.08-06-001 et al. | 08/07/2009 | ||||
| Ex Parte SCE representatives met with Advisor Matthew Deal on August 5, 2009 | |||||
| |||||
| A.08-06-001 et al. | 01/21/2010 | ||||
| Informal Response of Joint Utilities and Real Parties in Interest | |||||
| |||||
| A.08-06-001 et al. | 02/04/2009 | ||||
| Joint Opening Brief of PG&E, SDG&E, and SCE on Proposal of Transphase | |||||
| |||||
| A.08-06-001 et al. | 05/21/2009 | ||||
| SCE's April 2009 Monthly ILP and DR Programs Report | |||||
| |||||
| A.08-06-001 et al. | 12/08/2008 | ||||
| SCE's Comments to PD Adopting Bridge Funding for 2009 Demand Response Programs | |||||
| |||||
| A.08-06-001 et al. | 03/23/2009 | ||||
| SCE's Feb 2009 Monthly ILP and DRP Report | |||||
| |||||
| A.08-06-001 et al. | 01/30/2009 | ||||
| SCE's Filing Pursuant to Rule 13.1 Notice Requirements | |||||
| |||||
| A.08-06-001 et al. | 10/21/2009 | ||||
| SCE's Interruptible Load Programs and Demand Response Programs Report for September 2009 | |||||
| |||||
| A.08-06-001 et al. | 08/21/2009 | ||||
| SCE's July 2009 ILP and DRP Report | |||||
| |||||
| A.08-06-001 et al. | 08/20/2010 | ||||
| SCE's July 2010 Monthly ILP Report | |||||
| |||||
| A.08-06-001 et al. | 04/20/2010 | ||||
| SCE's March 2010 Monthly Report for ILP and DRP | |||||
| |||||
| A.08-06-001 et al. | 06/22/2009 | ||||
| SCE's May 2009 Monthly ILP and DR Program Report | |||||
| |||||
| A.08-06-001 et al. | 05/21/2010 | ||||
| SCE's Momthly ILP and DRP Report for April 2010 | |||||
| |||||
| A.08-06-001 et al. | 06/21/2010 | ||||
| SCE's Momthly ILP and DRP Report for May 2010 | |||||
| |||||
| A.08-06-001 et al. | 07/21/2009 | ||||
| SCE's Monthly Report on June 2009 ILP and DR Programs | |||||
| |||||
| A.08-06-001 et al. | 12/22/2008 | ||||
| SCE's Nov 08 Report on IL/DR Programs | |||||
| |||||
| A.08-06-001 et al. | 03/18/2010 | ||||
| SCE'S PETITION FOR MODIFICATION OF D. 09-08-027 | |||||
| |||||
| A.08-06-001 et al. | 10/28/2008 | ||||
| SCE's Proof of Rule 3.2(C) Notice Requirement (Proofs of Publication) | |||||
| |||||
| A.08-06-001 et al. | 12/16/2008 | ||||
| SCE's Rebuttal Testimony | |||||
| |||||
| A.08-06-001 et al. | 02/12/2009 | ||||
| SCE's Reply Brief | |||||
| |||||
| A.08-06-001 et al. | 02/11/2009 | ||||
| SCE's Reply Brief | |||||
| |||||
| A.08-06-001 et al. | 10/09/2008 | ||||
| SCE's Reply in Support of Amended Application | |||||
| |||||
| A.08-06-001 et al. | 03/05/2009 | ||||
| SCE's Reply to CLECA's Comments to ALJ Ruling Requiring Additional Cost Effective Information | |||||
| |||||
| A.08-06-001 et al. | 10/09/2008 | ||||
| SCE's Reply to Response to SCE's Request for Funding | |||||
| |||||
| A.08-06-001 et al. | 01/13/2009 | ||||
| SCE's Response to ALJ Ruling re Compliance with Rule 13.1 (b) Procedures | |||||
| |||||
| A.08-06-001 et al. | 10/15/2008 | ||||
| SCE's Response to ALJ Ruling Requiring Additional Information | |||||
| |||||
| A.08-06-001 et al. | 10/17/2008 | ||||
| SCE's Supplement to Proof of Rule 3.2(C) Notice Requirement | |||||
| |||||
| A.08-06-001 et al. | 09/19/2008 | ||||
| SCE-01 Amended Testimony | |||||
| |||||
| A.08-06-001 et al. | 09/19/2008 | ||||
| SCE-02 MRTU Testimony | |||||
| |||||
| A.08-06-001 et al. | 09/19/2008 | ||||
| SCE-03 IDSM Testimony | |||||
| |||||
| A.08-06-001 et al. | 09/19/2008 | ||||
| SCE-04 Appendices A-M | |||||
| |||||
| A.08-06-001 et al. | 02/19/2009 | ||||
| SCE-05 Appendices N-R Public Redacted Version | |||||
| |||||
| A.08-06-001 et al. | 09/19/2008 | ||||
| SCE-05 Appendices N-R Public Redacted Version | |||||
| |||||
| A.08-06-001 et al. | 01/06/2009 | ||||
| SCE-1 Errata | |||||
| |||||
| A.08-06-001 et al. | 01/06/2009 | ||||
| SCE-7B Errata | |||||
| |||||
| A.08-06-001 et al. | 02/22/2010 | ||||
| SCE 2009 Year-End and January 2010 Monthly ILP and DR Report | |||||
| |||||
| A.08-06-001 et al. | 09/29/2008 | ||||
| SCE Amended DR Application | |||||
| |||||
| A.08-06-001 et al. | 03/27/2009 | ||||
| SCE Amendment to Response to ALJ Ruling on DR Filing re Cost-Effectiveness (Public Version) | |||||
| |||||
| A.08-06-001 et al. | 04/17/2009 | ||||
| SCE and ECS Joint Motion to Withdraw DRRPA from Consideration | |||||
| |||||
| A.08-06-001 et al. | 03/27/2009 | ||||
| SCE Attachment to Amendment to Response to ALJ Ruling on DR Filing re Cost-Effectiveness (Public Version) | |||||
| |||||
| A.08-06-001 et al. | 03/05/2009 | ||||
| SCE Attachment to SCE Public Response to ALJ Ruling re CE Info (PDF) | |||||
| |||||
| A.08-06-001 et al. | 03/05/2009 | ||||
| SCE Attachment to SCE Public Response to ALJ Ruling re CE Info (XLS) | |||||
| |||||
| A.08-06-001 et al. | 04/01/2010 | ||||
| SCE Cover Letter re Emerging Markets & Technology | |||||
| |||||
| A.08-06-001 et al. | 01/21/2010 | ||||
| SCE Dec 2009 Monthly ILP and DR Report | |||||
| |||||
| A.08-06-001 et al. | 04/01/2010 | ||||
| SCE Emerging Markets & Technology Demand Response Projects Annual Report: 2009 | |||||
| |||||
| A.08-06-001 et al. | 12/17/2008 | ||||
| SCE Errata to SCE-07 Rebuttal Testimony Replacing page 44 | |||||
| |||||
| A.08-06-001 et al. | 03/19/2010 | ||||
| SCE Feb 2010 Monthly ILP and DR Programs Report | |||||
| |||||
| A.08-06-001 et al. | 02/24/2009 | ||||
| SCE Jan 2009 ILP and DR Programs Report | |||||
| |||||
| A.08-06-001 et al. | 03/05/2009 | ||||
| SCE Letter to ALJ Hecht re Status of DR Agreements | |||||
| |||||
| A.08-06-001 et al. | 03/04/2009 | ||||
| SCE Letter to ALJ Hecht re Status of DR Agreements | |||||
| |||||
| A.08-06-001 et al. | 03/04/2009 | ||||
| SCE Letter to ALJ Hecht re Status of DR Agreements | |||||
| |||||
| A.08-06-001 et al. | 04/21/2009 | ||||
| SCE March 2009 Monthly Report for ILP/DR Programs | |||||
| |||||
| A.08-06-001 et al. | 11/20/2009 | ||||
| SCE Monthly ILP and DR Programs Report for Dec 2008 | |||||
| |||||
| A.08-06-001 et al. | 01/21/2009 | ||||
| SCE Monthly ILP and DR Programs Report for Dec 2008 | |||||
| |||||
| A.08-06-001 et al. | 12/21/2009 | ||||
| SCE Monthly ILP Report for November 2009 | |||||
| |||||
| A.08-06-001 et al. | 11/21/2008 | ||||
| SCE Monthly ILP/DRP Monthly Report for Oct 2008 | |||||
| |||||
| A.08-06-001 et al. | 07/21/2010 | ||||
| SCE Monthly ILP/DRP Report for June 2010 | |||||
| |||||
| A.08-06-001 et al. | 09/21/2009 | ||||
| SCE Monthly Report for August 2009 | |||||
| |||||
| A.08-06-001 et al. | 02/24/2009 | ||||
| SCE Motion to File Confidential Version of Response of SCE to ALJ Ruling Requiring Additional Cost Effectiveness Information | |||||
| |||||
| A.08-06-001 et al. | 02/25/2009 | ||||
| SCE Motion to File Confidential Version of Settlement Agreement Under Seal | |||||
| |||||
| A.08-06-001 et al. | 09/29/2008 | ||||
| SCE NOA for Amended DR Application | |||||
| |||||
| A.08-06-001 et al. | 12/30/2009 | ||||
| SCE NOA of PLP Feasibility Report | |||||
| |||||
| A.08-06-001 et al. | 11/07/2008 | ||||
| SCE Notice of Rule 3.2(C) and 3.2(D) Compliance | |||||
| |||||
| A.08-06-001 et al. | 11/24/2009 | ||||
| SCE October 2009 Monthly Report on ILP and DRP | |||||
| |||||
| A.08-06-001 et al. | 01/28/2009 | ||||
| SCE Opening Brief | |||||
| |||||
| A.08-06-001 et al. | 07/20/2009 | ||||
| SCE Opening Comments on ALJ Hech PD | |||||
| |||||
| A.08-06-001 et al. | 07/20/2009 | ||||
| SCE Opening Comments on ALJ Hech PD | |||||
| |||||
| A.08-06-001 et al. | 12/29/2009 | ||||
| SCE PLP Feasibility Report | |||||
| |||||
| A.08-06-001 et al. | 10/09/2008 | ||||
| SCE Proof of Rule 3.2(C) Notice Requirement | |||||
| |||||
| A.08-06-001 et al. | 02/18/2009 | ||||
| SCE Public Redacted Version of Joint Motion for Adoption of Settlement Agreement | |||||
| |||||
| A.08-06-001 et al. | 07/27/2009 | ||||
| SCE Reply Comments on ALJ Hecht PD Adopting Demand Response Activities and Budgets for 2009-11 | |||||
| |||||
| A.08-06-001 et al. | 04/07/2009 | ||||
| SCE Reply to ECS Comments re Joint Motion of DRA, SCE, EnerNOC, and AER for Adoption of Settlement Agreement | |||||
| |||||
| A.08-06-001 et al. | 11/14/2008 | ||||
| SCE Response to Transphase's Motion to Compel | |||||
| |||||
| A.08-06-001 et al. | 08/16/2010 | ||||
| SCE Supplemental Filing Pursuant to ALJ Hecht's Ruling of August 9, 2010 | |||||
| |||||
| A.08-06-001 et al. | 11/24/2008 | ||||
| SCE Supplemental Testimony | |||||
| |||||
| A.08-06-001 et al. | 05/21/2010 | ||||
| SCE WG2 Monthly ILP and DRP Enhanced Report for April 2010 | |||||
| |||||
| A.08-06-001 et al. | 07/21/2010 | ||||
| SCE WG2 Monthly ILP and DRP Enhanced Report for June 2010 | |||||
| |||||
| A.08-06-001 et al. | 06/21/2010 | ||||
| SCE WG2 Monthly ILP and DRP Enhanced Report for May 2010 | |||||
| |||||
| A.08-06-001 et al. | 01/05/2009 | ||||
| SCE Witness Russell Garwacki's Quals | |||||
| |||||
| A.08-06-001 et al. | 12/15/2008 | ||||
| SCEs Reply Comments to PD Adopting Bridge Funding for 2009 DR Programs | |||||
| |||||
| ||||||
| A.08-06-001 | 07/08/2008 | ||||
| SCE's Errata to Demand Response Testimony | |||||
| |||||
| A.08-06-001 | 07/25/2008 | ||||
| SCE's Proof of Rule 3.2(D) Notice Requirement | |||||
| |||||
| A.08-06-001 | 07/24/2008 | ||||
| SCE's Reply DR Application Refiling and Reservice | |||||
| |||||
| A.08-06-001 | 08/05/2008 | ||||
| SCE's Supplement to Rule 3.2 (C) Notice Requirement | |||||
| |||||
| A.08-06-001 | 06/12/2008 | ||||
| SCE 2009-11 DR Application | |||||
| |||||
| A.08-06-001 | 06/12/2008 | ||||
| SCE 2009-11 SCE-01 DR Testimony | |||||
| |||||
| A.08-06-001 | 06/13/2008 | ||||
| SCE 2009-11 SCE-02 DR Public Testimony | |||||
| |||||
| A.08-06-001 | 06/12/2008 | ||||
| SCE NOA for DR Application | |||||
| |||||
| A.08-06-001 | 06/25/2008 | ||||
| SCE Notice of Application to Cities and Counties | |||||
| |||||
| A.08-06-001 | 06/23/2008 | ||||
| SCE Proof of Rule 3.2 (C) Compliance | |||||
| |||||
| ||||||
| A.07-01-024 | 06/18/2007 | ||||
| Attachment E | |||||
| |||||
| A.07-01-024 | 06/18/2007 | ||||
| Attachment F Appendix A | |||||
| |||||
| A.07-01-024 | 06/18/2007 | ||||
| Attachment F Appendix B | |||||
| |||||
| A.07-01-024 | 10/27/2008 | ||||
| Joint Parties Comments of the Joint Utilities to the Proposed Decision of ALJ Gamson Addressing the Petitions for Modification of D.07-12-050 | |||||
| |||||
| A.07-01-024 | 07/11/2007 | ||||
| SCE Amended Supplemental Testimony | |||||
| |||||
| A.07-01-024 | 01/16/2007 | ||||
| SCE Application for Approval of Embedded Energy Efficiency Water Pilot Programs for 2007-2008 | |||||
| |||||
| A.07-01-024 | 07/11/2007 | ||||
| SCE ATTACHMENTS to Amended Supplemental Testimony | |||||
| |||||
| A.07-01-024 | 12/05/2007 | ||||
| SCE Comments on Proposed Decision | |||||
| |||||
| A.07-01-024 | 06/16/2009 | ||||
| SCE Letter to Paul Clanon re Request for Extension of Water Pilots Until Commission Responds to Joint Utilities' Petition for Modification in A.07-01-024 et al. | |||||
| |||||
| A.07-01-024 | 12/10/2007 | ||||
| SCE Reply Comments on Proposed Decision | |||||
| |||||
| A.07-01-024 | 03/19/2008 | ||||
| SCE Report of Southern California Edison Pursuant to D.07-12-050 | |||||
| |||||
| A.07-01-024 | 07/25/2007 | ||||
| SCE Response to Comments on the Utilities Proposed Water Pilot Program | |||||
| |||||
| A.07-01-024 | 03/06/2007 | ||||
| SCE Response to Protests and Comments to Embedded Energy and Water Pilots Programs | |||||
| |||||
| A.07-01-024 | 06/18/2007 | ||||
| SCE Supplemental Testimony | |||||
| |||||
| A.07-01-024 | 09/05/2008 | ||||
| Various Petition to Modify Decision 07-12-050 | |||||
| |||||
| ||||||
| A.10-07-XXX | 07/02/2010 | ||||
| SCE Application for Approval of its Palm Desert Demonstration | |||||
| |||||
| ||||||
| A.10-07-004 | 08/27/2010 | ||||
| SCE Ammended Application | |||||
| |||||
| A.10-07-004 | 08/16/2010 | ||||
| SCE Reply to Protest to Application | |||||
| |||||
| ||||||
| A.09-09-XXX MVPP Novation | 09/24/2009 | ||||
| SCE Application | |||||
| |||||
| A.09-09-XXX MVPP Novation | 09/22/2009 | ||||
| SCE Application for Approval of Transactions Related to a Renewables Portfolio Standard Replacement Agreement | |||||
| |||||
| ||||||
| A.09-09-015 | 09/22/2009 | ||||
| SCE-01 Public Testimony | |||||
| |||||
| A.09-09-015 | 11/02/2009 | ||||
| SCE-02 Public Supplemental Testimony | |||||
| |||||
| A.09-09-015 | 05/24/2010 | ||||
| SCE Notice of Ex Parte Communication | |||||
| |||||
| A.09-09-015 | 03/25/2010 | ||||
| SCE Prehearing Conference Statement | |||||
| |||||
| A.09-09-015 | 11/12/2009 | ||||
| SCE Reply to Protest | |||||
| |||||
| ||||||
| A.10-01-011 | 02/26/2010 | ||||
| SCE's Response to ALJ Ruling Requiring Additional Information within 10 Business Days | |||||
| |||||
| A.10-01-011 | 02/19/2010 | ||||
| SCE Application for Debt and Stock Authorization | |||||
| |||||
| A.10-01-011 | 08/02/2010 | ||||
| SCE Notice of Exparte Communication | |||||
| |||||
| A.10-01-011 | 03/26/2010 | ||||
| SCE Response to ALJ Follow-up Questions | |||||
| |||||
| A.10-01-011 | 02/26/2010 | ||||
| SCE Response to ALJ Ruling Requiring Additional Information within 10 Business Days | |||||
| |||||
| ||||||
| A.09-04-008 | 05/28/2010 | ||||
| Comments of SCE PGE SDGE on PD on PFM | |||||
| |||||
| A.09-04-008 | 11/10/2009 | ||||
| HEI and SCE Joint Response to the Application for Rehearing of D.09-09-049 | |||||
| |||||
| A.09-04-008 | 04/13/2009 | ||||
| Notice re NDCTP Served to Cities and Counties | |||||
| |||||
| A.09-04-008 | 05/06/2009 | ||||
| Response of SCE to Protests and Comments | |||||
| |||||
| A.09-04-008 | 11/30/2009 | ||||
| SCE's Notice of Ex Parte Communication - SCE met with Andy Campbell, Advisor to Commissioner Chong, regarding the Proposed Decision of ALJ Sullivan (PD) in this proceeding on November 23, 2009 | |||||
| |||||
| A.09-04-008 | 05/06/2010 | ||||
| SCE-PG&E-SDG&E Motion For A Shortened Procedural Schedule | |||||
| |||||
| A.09-04-008 | 05/06/2010 | ||||
| SCE-PG&E-SDG&E Petition to Modify D.09-12-014 | |||||
| |||||
| A.09-04-008 | 08/10/2009 | ||||
| SCE and Hydrogen Energy International Rebuttal Testimony | |||||
| |||||
| A.09-04-008 | 04/08/2009 | ||||
| SCE Application for Authorizatin to Recover Costs | |||||
| |||||
| A.09-04-008 | 11/23/2009 | ||||
| SCE Comments on the PD of ALJ Sullivan | |||||
| |||||
| A.09-04-008 | 04/08/2009 | ||||
| SCE Motion for an Expedited Procedural Schedule | |||||
| |||||
| A.09-04-008 | 08/10/2009 | ||||
| SCE Motion to Strike Portions of Rebuttal Testimony by DRA | |||||
| |||||
| A.09-04-008 | 12/02/2009 | ||||
| SCE Notice of Ex Parte Communication Cho (11-30-09) | |||||
| |||||